michkrom
New Member
Hi,
I have a bathroom plan that would connect:
sink --> shower --> WC --> main
This is a horizontal projection: the waste lines will have some horizontal parts not shown here.
For a convenience of vent location I'd prefer 1 and 2 but these may not be in code (vent of horizontal drain behind waste line connections?).
The 3 seems code-ok (?) if the san/wye T under the WC is possible?
Any advice? I am IRC.
Regards,
Newbie Michal
I have a bathroom plan that would connect:
sink --> shower --> WC --> main
This is a horizontal projection: the waste lines will have some horizontal parts not shown here.
For a convenience of vent location I'd prefer 1 and 2 but these may not be in code (vent of horizontal drain behind waste line connections?).
The 3 seems code-ok (?) if the san/wye T under the WC is possible?
Code:
/\
:
:
: Lv-e
: | Sh-e WC
: | | |
E------T------T-----T----main
/\
:
:
: Lv-e
: | Sh-e WC
: | | |
E------T------T-----T
|
\----main
/\
:
:
T- Lv
| Sh-e WC
| | |
E-------T------T
|
\----main
Any advice? I am IRC.
Regards,
Newbie Michal