Hello. I could use some advice on plumbing in a bathroom I’m doing on my steel building. I’m doing a shower, toilet and sink. There is an rv dump line on the main trunk as well that goes out 50’ there will be a clean out that will go in the wall about half way down the rv line. There will also be a clean out where the vent/sink line will come up the wall as well. The 3” vent stack will serve the vanity and vent to roof. Nothing is glued yet, just want to get some insight to make sure this looks right? Thanks in advance.