Eweneek1
Member
- Messages
- 40
- Reaction score
- 0
- Points
- 6
Need to replace move drain stack between first floor and second floor. Current cast iron stack is probably about 70 years old. Can't save the stack most likely and I want to keep the sound transmission low. Could I use 4" schedule 80 pipe instead of replacing with no hub cast iron?