Jakefromstatefarm
New Member
Hello I am new to this forum and I have a question for the pros. I just built a new house and left a hole through the concrete slab to the dirt below for a Sandpoint well to go through. I used a Sandpoint from Tractor Supply and schedule 40 galvanized pipe 1 1/4 inch diameter. I rented a jack hammer and the first 8' went fine. At about the 9' mark, the pipe broke off at the threads. I want to pull the point and first 5' section back out and try again with sch80 pipe but i cant figure out how to get ahold of it. It is almost 5' deep in a 4" dia hole through concrete with no way to dig down to it. Any suggestions?