49er Dude
New Member
I removed an acrylic shower pan and will be building a morter bed and tiling. The riser is out of plumb about 8 degrees in two directions (1 inch in 12). The arrows indicate the direction for the riser needs to move to be plumb. Since it was easy to get through the slab sump I dug down to the p trap which is about 14 inches or so below the slab. I've seen advice in another thread to remove the p trap and reinstall. Though almost exposed it will be difficult to cut, glue and make sure it is plumb partially under the slab 14 inches down. I have 12 inches of riser above the joint and will be moving the drain location a few inches from the current riser location. I had a plumber give me a quote of $500 to remove a small portion of the slab within the blue tape area and connect the drain ( I have the drain already). Thanks in advance for all advice. Dave
This is black ABS 2 inch pipe.