doing the project in uponor
But have a really hard time with the layout for the repipe to make sure I have enough pressure
Does anybody have experience in this
I looking for suggestion on pipe size and how to run the plumbing in master bath
My plan is to tie in the 2 water heater in series with 3/4 and drop down to 1/2 to guess bath, coming out with 3/4 @ the 2 water heater
From there I am lost, should I do 1 manifold, multiple manifold, truck and base or something different to supply the 6 remaining hot lines?
Cold will be 3/4 from first water heater with a 1/2 drop down for guest, bypassing the second water heater straight into master bath where 7 outlets would need water
2nd drawing was how I was thinking about running it but I have my doubts right now
Any experts on this that can tell or draw me a solution
Thank you
But have a really hard time with the layout for the repipe to make sure I have enough pressure
Does anybody have experience in this
I looking for suggestion on pipe size and how to run the plumbing in master bath
My plan is to tie in the 2 water heater in series with 3/4 and drop down to 1/2 to guess bath, coming out with 3/4 @ the 2 water heater
From there I am lost, should I do 1 manifold, multiple manifold, truck and base or something different to supply the 6 remaining hot lines?
Cold will be 3/4 from first water heater with a 1/2 drop down for guest, bypassing the second water heater straight into master bath where 7 outlets would need water
2nd drawing was how I was thinking about running it but I have my doubts right now
Any experts on this that can tell or draw me a solution
Thank you