Radiant Boiler & Distribution System Share

Users who are viewing this thread

winesalot

Member
Messages
54
Reaction score
0
Points
6
Location
Chelan, WA
image.jpeg
I am almost done with the radiant boiler and distribution manifold for our soon to be built winery building. What you don't see is 5 separate tubing manifolds located throughout the 8100 sqft building and nearly 10,000 feet of 1/2" pex that will be in the 6" slab floor. (If you look closely you'll see the 1/2" copper lines around the pressure tank aren't done. I decided to add a union at the pressure tank but didn't have one on hand). This is my first time working with copper. It's been a fun project and I'm kinda sad it's done.
 

winesalot

Member
Messages
54
Reaction score
0
Points
6
Location
Chelan, WA
Sitting on my work cart. It attaches to the 1/2” lines by the pressure tank. Like I said, I’m almost done, lol.
 
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks