BobGa
Member
I saw a build where they put in these triangular rods about 1" is size into the ground to keep the pipes plumb before the pour.
they look like a plastic that stays in after the pour
What are they called?
Also best practice to wrap (or not) the PVC and PEX thu the slab
they look like a plastic that stays in after the pour
What are they called?
Also best practice to wrap (or not) the PVC and PEX thu the slab
Last edited by a moderator: