M3
Member
I am installing a Moen Exact Temp shower spa with 4 body sprays and received a plumbing diagram from Moen.. I'm sure Moen does a lot of testing, but I've looked at other Pressure Balancing Loop diagrams and Moen's is different. I've attached their diagram.
Most diagrams I've seen had the supply line entering somewhere in the middle of the loop, then Tee off to left and right... I've called Moen and they say it is correct. I'm using 3/4" copper to the mixing valve and to the flow valves, then 1/2" out of the flow valves to the heads.
Any thoughts? I just don't want to install and have the pressure be off.
Thanks in advance.
Most diagrams I've seen had the supply line entering somewhere in the middle of the loop, then Tee off to left and right... I've called Moen and they say it is correct. I'm using 3/4" copper to the mixing valve and to the flow valves, then 1/2" out of the flow valves to the heads.
Any thoughts? I just don't want to install and have the pressure be off.
Thanks in advance.