Not really doing anything new but wanted to get a confirmation that the previous contractor did the plumbing correctly for a bathroom in the basement before I close up the walls and fill the floor in with concrete. I did have to cut out the old plumbing as the slope was going the wrong way (sloped to the toilet) and replaced it pretty much the way it was. Thanks for taking a look!