Hello,
I'm trying to install permeate pump on my RCC7P RO system with a tank and booster pump, and honestly, struggling with understanding on where to connect drain-out from the permeate pump.
I was about to connect line from "Flow restrictor" into "drain-in" on my permeate pump, but wasn't sure if it needs to be connected before "ASOF" discharge line (#1 on the diagram) or after (#2 on the diagram).
Could you tell me if #1 vs #2 make any difference for my install?
Thank you!
I'm trying to install permeate pump on my RCC7P RO system with a tank and booster pump, and honestly, struggling with understanding on where to connect drain-out from the permeate pump.
I was about to connect line from "Flow restrictor" into "drain-in" on my permeate pump, but wasn't sure if it needs to be connected before "ASOF" discharge line (#1 on the diagram) or after (#2 on the diagram).
Could you tell me if #1 vs #2 make any difference for my install?
Thank you!