Moving 1.5" copper vent pipe exposed during kitchen soffit removal

Users who are viewing this thread

MrHappy

New Member
Messages
10
Reaction score
2
Points
3
Location
Minnesota
mrhappy.jpg


Doing a kitchen remodel which involved removing the soffit for cabinets to the ceiling. All went well except it revealed the vent for kitchen (and also vents laundry room sink, floor drain, and washing machine below kitchen). I was hoping the vent would be covered in the top portion of a cabinet, but the cabinets stop a couple inches to the side of the pipe.

The 1.5" copper vent extends up to just below the 2x4 top plate, 90 elbow into the old soffit space, 90 straight up again into what looks like a galvanized pipe that extends out the roof. This transition to galvanized occurs below the ceiling, around the middle of the 2 top plates.

Is it possible to cut the copper below the top plate, transition to PVC, notch the top plate (and add mending plate), then cut off enough of the galvanized so the PVC can transition into it with another 90?

Currently the galvanized is connected to copper with a threaded connection + a union. If I cut off the threaded portion, can I connect PVC with a rubber coupling?

Will there be other issues with this solution? Possible problems I was thinking were: would vibrations during cutting of the pipes causing it to come loose from the roof? Does the pipe need to be secured above or below if I splice in PVC near the top like this? It's a hip roof and joists run parallel to the top plate, but the rafters (and perpendicular joists every 4ft along the wall) all line up over the studs, so I'm thinking a 2inch notch in the top plate should be ok, but perhaps not? Anything else I'm missing? If it's too difficult or dangerous I am ok building some sort of soffit again just over this section only, but that would preferably be a last resort
 
Last edited by a moderator:

Jeff H Young

In the Trades
Messages
8,893
Reaction score
2,221
Points
113
Location
92346
I wouldnt have a problem drilling the plates and put a strap . but issue might be in those cold weather places the snow and ice getting in I dont know if you can 90 that close to roof line. BTW thats 2 inch pipe going through roof
 

MrHappy

New Member
Messages
10
Reaction score
2
Points
3
Location
Minnesota
I wouldnt have a problem drilling the plates and put a strap . but issue might be in those cold weather places the snow and ice getting in I dont know if you can 90 that close to roof line. BTW thats 2 inch pipe going through roof
Dang ok. This is in MN so the weather does get quite cold. The 90 would be almost touching the roof, only an inch or 2 to spare. I could spray a bit of closed cell foam in that section if that'd help at all? Or do you think it'd be best to just leave it as is and not move the pipe at all as it'd just be too close to the roof?
 

John Gayewski

In the Trades
Messages
4,346
Reaction score
1,340
Points
113
Location
Iowa
Not sure what plumbing code Minnesota follows, but UPC needs a foot of pipe below the roof penetrations. That said if I were in your situation I wouldn't be afraid to do what I needed to do. As long as you converted to plastic and stay with the plastic all the way through the roof and use some pipe clamps to keep the pipe secure.
 

sajesak

Member
Messages
98
Reaction score
1
Points
8
Location
United States
View attachment 87467

Doing a kitchen remodel which involved removing the soffit for cabinets to the ceiling. All went well except it revealed the vent for kitchen (and also vents laundry room sink, floor drain, and washing machine below kitchen). I was hoping the vent would be covered in the top portion of a cabinet, but the cabinets stop a couple inches to the side of the pipe.

The 1.5" copper vent extends up to just below the 2x4 top plate, 90 elbow into the old soffit space, 90 straight up again into what looks like a galvanized pipe that extends out the roof. This transition to galvanized occurs below the ceiling, around the middle of the 2 top plates.

Is it possible to cut the copper below the top plate, transition to PVC, notch the top plate (and add mending plate), then cut off enough of the galvanized so the PVC can transition into it with another 90?

Currently the galvanized is connected to copper with a threaded connection + a union. If I cut off the threaded portion, can I connect PVC with a rubber coupling?

Will there be other issues with this solution? Possible problems I was thinking were: would vibrations during cutting of the pipes causing it to come loose from the roof? Does the pipe need to be secured above or below if I splice in PVC near the top like this? It's a hip roof and joists run parallel to the top plate and how to remove a kitchen soffit, but the rafters (and perpendicular joists every 4ft along the wall) all line up over the studs, so I'm thinking a 2inch notch in the top plate should be ok, but perhaps not? Anything else I'm missing? If it's too difficult or dangerous I am ok building some sort of soffit again just over this section only, but that would preferably be a last resort
Hello. I wanted to explore adding soffits to a kitchen ceiling. When I went to delete one of the soffits, it removed the ceiling above it! Not my intent. How do I fix this?
 

Jeff H Young

In the Trades
Messages
8,893
Reaction score
2,221
Points
113
Location
92346
replace cieling drywall look at a you tube but it can be hard for beginer to match texture
 
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks