Joshua5438
Member
Hopefully ready for inspection now. What is not visible - one completed circuit, 20A gfci outlet (all that is required per the building department), two 8ft ground rods driven flush with grade, 8ft apart and connected with a continuous #4 bare copper wire, and #4 bonding wire from main panel to steel structure.
Last edited by a moderator: