Rebecca3030
New Member
Ready to start installation of Pressure reducing valves, shutoff and Pressure gauge and all. Its a tri level, slab and crawl space. Main water supply is 3/4 inch copper and enters home through basement slab into concrete block shower floor. And silcock is just 1 inch off the floor I'm continuing with pex and replacing silcock. Shower is 33 inches wide. Hopefully that explains.
This shower is used maybe 2 times a year.
Should / can I install everything exposed inside the shower or somehow extend supply elsewhere first. Thank you in advance for your continued help.
This shower is used maybe 2 times a year.
Should / can I install everything exposed inside the shower or somehow extend supply elsewhere first. Thank you in advance for your continued help.