Hello,
I am planning to convert an existing small 3 pcs (sink, toilet, and a tub) bathroom into a bigger one, which will additionally have a shower and a bidet. Currently both the toilet and the tub are wet-vented through the sink. Here's a photo of the plumbing taken from underneath:
The pipe to the left is the sink drain, and the pipe to the right is the tub drain. The vent pipe cannot be seen on this photo but it is connected under the sink. This stack is not used for anything else in the house.
My plans include relocating the toilet to roughly where the tub currently is, adding a bidet at its side, as well as relocating the tub and adding a shower. So, my question is how should I connect all the drains to this stack and whether I need additional vents?
Thanks.
I am planning to convert an existing small 3 pcs (sink, toilet, and a tub) bathroom into a bigger one, which will additionally have a shower and a bidet. Currently both the toilet and the tub are wet-vented through the sink. Here's a photo of the plumbing taken from underneath:
The pipe to the left is the sink drain, and the pipe to the right is the tub drain. The vent pipe cannot be seen on this photo but it is connected under the sink. This stack is not used for anything else in the house.
My plans include relocating the toilet to roughly where the tub currently is, adding a bidet at its side, as well as relocating the tub and adding a shower. So, my question is how should I connect all the drains to this stack and whether I need additional vents?
Thanks.