Kitchen Cleanouts and IPC 2015 708.1.4

Users who are viewing this thread

Rossn

Member
Messages
365
Reaction score
17
Points
18
Location
Denver, CO
Can someone help clarify for me the 45 degree requirement on IPC 2015 708.1.4?

Is the interpretation that as long as a horizontal joint is a 45 or less, that no cleanout is required, even if two 45's are back-to-back as an offset?

ipc_2015_708.1.4.jpg
 
Last edited:
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks