Hi friends, I hired tiler/carpenter who's fitting a bathroom into an upstairs bedroom which will connect with down stair combi-boiler for hot and cold, its a Flexicom 30 boiler. Now I have identified the hot outlet alongside cold feed and want to put a 15mm copper tee in both, then run this up to the new bathroom.
Both the pipes go down into the concrete floor so not a lot of play in them if any, is it okay to disconnect them from the combi, connect the fittings then reconnect them? Would I need jointing paste to reconnect?
Really appreciate any advice please
Also, might replace a 100x800 l/hand quadrant shower enclosure to fit my existing shower tray. Replacing with a new tray will probably mean at the least re-tiling the floor and possibly the walls too. The problem is the existing shower tray is 500mm radius. I invested days checking out retail/ online/ offline visits local (Mumbai) suppliers without luck. Do help me with this regard as well.
Paying labor charge 100 rupee per hour (1GBP) and believe work might be done with day or two
Great thanks
Tara
Both the pipes go down into the concrete floor so not a lot of play in them if any, is it okay to disconnect them from the combi, connect the fittings then reconnect them? Would I need jointing paste to reconnect?
Really appreciate any advice please
Also, might replace a 100x800 l/hand quadrant shower enclosure to fit my existing shower tray. Replacing with a new tray will probably mean at the least re-tiling the floor and possibly the walls too. The problem is the existing shower tray is 500mm radius. I invested days checking out retail/ online/ offline visits local (Mumbai) suppliers without luck. Do help me with this regard as well.
Paying labor charge 100 rupee per hour (1GBP) and believe work might be done with day or two
Great thanks
Tara