I cut the four inch PVC down to where the toilet flange would be at finished floor level but it won’t go down into the pipe. It only goes in about 5/8”. I was thinking of cutting it down to where inserting about that far would leave me at finished floor level and epoxing it in for strength. Is that an acceptable way to do it is my question?