I will be installing a 30" hinged shower door attached to the wall and a 30" fixed panel across a 60 inch straight shower opening. The unit is frameless, so the fixed panel sits in a u channel on the bottom and the wall.
Any tips/tricks on getting the door and fixed panel installed & lined up?
One reservation I have is that the instructions have me drilling 1 1/4" holes to anchor the u-channel to the shower curb. I am pretty sure if I drill this deep I will be piercing the rubber membrane underneath!
Also if I don't hit a stud when I mount the door hinges is it acceptable to drill and use plastic anchors with the 2" screws (I have 1/4" thick limestone 12x12 tiles mounted over 1/2" hardie board)
Any tips/tricks on getting the door and fixed panel installed & lined up?
One reservation I have is that the instructions have me drilling 1 1/4" holes to anchor the u-channel to the shower curb. I am pretty sure if I drill this deep I will be piercing the rubber membrane underneath!
Also if I don't hit a stud when I mount the door hinges is it acceptable to drill and use plastic anchors with the 2" screws (I have 1/4" thick limestone 12x12 tiles mounted over 1/2" hardie board)