So I'm having trouble identifying what to do in this situation. The well that I had drilled recently turned out to be artesian (positive pressure), so installing a normal inspection port simply won't work as water would flow with the top open/removed. The only way I can think of this working is if I run the pump during inspection. Is there another way I can go about doing this? I've contacted the state on the matter and they won't give me much, if any information on subject. I was hoping some of you might have some insight.