TheOverThinker
Member
I need to move a 1.5" galvanized waste stack to avoid a solar panel. There's a skylight nearby, so the new stack will have to meet California code, and terminate nearly 3' above the roof.
How can I secure that vertical section, so no future roofer holds on to it, and sees it bend or break off? Below the deck of the roof there is only a 5.5" rafter to attach to, then the pipe needs to take an angle. There is not much to strap to, given the needed length.
Is there a top of deck mounted bracket that would fit under the eventual rubber roof jack?
Because of the clutter above, a strap up top is not a very attractive option. What else is used?
How can I secure that vertical section, so no future roofer holds on to it, and sees it bend or break off? Below the deck of the roof there is only a 5.5" rafter to attach to, then the pipe needs to take an angle. There is not much to strap to, given the needed length.
Is there a top of deck mounted bracket that would fit under the eventual rubber roof jack?
Because of the clutter above, a strap up top is not a very attractive option. What else is used?