I have 3 zone baseboard heat. I had to replace the pressure relief valve on the boiler and I now have air in the 2nd floor baseboards. I have bled the zone but still have some trapped air so I need to do some more bleeding. My concern is how to tell how full the boiler is. Do I just go by the pressure gauge? When it's at 15 psi there's enough water and close the fast fill or is there another way yo tell? Thanks for your help.