Hello everyone,
I was hoping to solicit some feedback on my current bathroom plumbing project. In my area, I need to adhere to the UPC. I am concerned about my plan to have the toilet drain directly into the 3" main sewer header and the 2" vent being downstream due to trying to avoid penetrating the load bearing wall behind the toilet. Let me know what you guys think or if you have any suggestions on how this could be done better.
I was hoping to solicit some feedback on my current bathroom plumbing project. In my area, I need to adhere to the UPC. I am concerned about my plan to have the toilet drain directly into the 3" main sewer header and the 2" vent being downstream due to trying to avoid penetrating the load bearing wall behind the toilet. Let me know what you guys think or if you have any suggestions on how this could be done better.