dognamedtuna
New Member
Hey everyone,
I'm an HVAC tech taking on a bathroom remodel in my own home. I've attached some diagrams I made of the current waste and vent pipe conditions. I'll be installing a new toilet, vanity, and tiled shower. I'd like to bring everything up to current code. This is a small bathroom in a loft. The ceilings are cathedral so I don't have the ability to tie any thing together in the floor above. I have already gutted the bathroom walls and removed the subfloor so I can do pretty much anything there. No walls are load bearing. I'd appreciate any help identifying what I should change and how best to go about it. Detailed and specific instructions are really helpful. Thanks so much to everyone.
I'm an HVAC tech taking on a bathroom remodel in my own home. I've attached some diagrams I made of the current waste and vent pipe conditions. I'll be installing a new toilet, vanity, and tiled shower. I'd like to bring everything up to current code. This is a small bathroom in a loft. The ceilings are cathedral so I don't have the ability to tie any thing together in the floor above. I have already gutted the bathroom walls and removed the subfloor so I can do pretty much anything there. No walls are load bearing. I'd appreciate any help identifying what I should change and how best to go about it. Detailed and specific instructions are really helpful. Thanks so much to everyone.