Looking at the service manual Rev G. page 10, there is this for RF (I use RF=dF2b)
What if a KCl user wanted to use downflow brine fill first? That would be RF=dFFF. That would inject BF water into the brine tank a couple or so hours before the backwash etc.
Questions:
What if a KCl user wanted to use downflow brine fill first? That would be RF=dFFF. That would inject BF water into the brine tank a couple or so hours before the backwash etc.
Questions:
- Would the RT (regeneration time) typically be adjusted to maybe 12:00 am to compensate, or would leaving RT at 2:00 am typically cause the brine draw to start around midnight, and the real action start at 2:00 am?
- Is dF2b the only setting with double backwash?