First time doing a 3 piece shower drain. Is this 1/8" gap

Users who are viewing this thread

raider1v1

New Member
Messages
1
Reaction score
0
Points
1
Location
kansas city
This was my first time doing a 3 piece drain. Between measuring for the depth of the drain, subfloor and slope, i have about a 1/8" gap between the shower drain piece and the PVC pipe thats solvent welded into it. All of the rest of my connections i was able to get to seat 100% into the coupling.

Do i need to tear this out and redo it?


UXUFwRV.jpg
 
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks