raider1v1
New Member
This was my first time doing a 3 piece drain. Between measuring for the depth of the drain, subfloor and slope, i have about a 1/8" gap between the shower drain piece and the PVC pipe thats solvent welded into it. All of the rest of my connections i was able to get to seat 100% into the coupling.
Do i need to tear this out and redo it?
Do i need to tear this out and redo it?