Got2Get8Done
New Member
Hello all,
I added 2 story addition at the end of my house. And I am in the process of rough plumbing the bathroom on the second floor and a laundry sink on the 1st floor underneath the stair case. I am routing the plumbing from the second floor to the basement to hook up with the existing plumbing. the rout to the basement starts at 2nd floor as seen in the attached drawing and runs about 11 ft horizontally around the staircase. Is my plan to code? Am I okay on the venting? Should I install a floor clean out in the bath room down stream from the toilet? Where else should clean outs be installed? Please rotate the attached pdf isometric drawing 90 degrees clockwise.
** Code enforced in my area is 2003 UPC.
Thank you for your advice.
I added 2 story addition at the end of my house. And I am in the process of rough plumbing the bathroom on the second floor and a laundry sink on the 1st floor underneath the stair case. I am routing the plumbing from the second floor to the basement to hook up with the existing plumbing. the rout to the basement starts at 2nd floor as seen in the attached drawing and runs about 11 ft horizontally around the staircase. Is my plan to code? Am I okay on the venting? Should I install a floor clean out in the bath room down stream from the toilet? Where else should clean outs be installed? Please rotate the attached pdf isometric drawing 90 degrees clockwise.
** Code enforced in my area is 2003 UPC.
Thank you for your advice.
Attachments
Last edited: