Kev_C
New Member
Hi, I want to connect a new bathroom into an existing drain in a single story house. I propose to make one connection into the existing drain and then run a new horizontal drain through the new bathroom to pick up sink, toilet and shower. At the end of this will be a vent. If the branch's for each if these is short (less than 1m) will this venting arrangement be ok?