I have been tasked many times over the years with installing additional floor drains where core drilling is involved. I have done this many different ways with mixed success. I am not a plumber, i am a Facilities Manager with 20 years experience and have capable staff and decent equipment, we do a lot of plumbing. Here is my question:
What is the proper way to install a floor drain in a commercial setting where the floor has to be cored? Do you core a 4" hole followed by a 6" down a couple inches, chip out the concrete and set the drain? What is the right material to set it in? What is the best drain to use?
Any help is greatly appreciated!
Brian
What is the proper way to install a floor drain in a commercial setting where the floor has to be cored? Do you core a 4" hole followed by a 6" down a couple inches, chip out the concrete and set the drain? What is the right material to set it in? What is the best drain to use?
Any help is greatly appreciated!
Brian