willy65000
New Member
Hello, I was sent here from the John Bridge tile forum and here is my question. I'm going to be starting a full bathroom remodel in my basement which will require the relocation of my shower and toilet drains for the desired layout. This will involve breaking up the slab in part of the bathroom and more or less moving each drain about a foot in one direction as well as replacing the shower drain with a pan liner type drain assembly. I'm a little concerned about the process of using a jackhammer to loosen the concrete because I know that my toilet drain from the upper level bathroom runs down behind this bathroom and into the slab in the same general area that I'll be demoing. In other words I don't want to destroy the plumbing for my other bathrooms and render them useless. Any advice for making this process as painless as possible would be greatly appreciated. Also, once all the concrete and dirt are removed, is the drain relocation something the average fairly skilled do it your selfer would be able to accomplish on his own with with advice from people on this forum?
Thank You,
Bill
Thank You,
Bill