Lightningwill
New Member
If I have a waste stack changing from vertical to horizontal, with limited vertical room to incorporate a cleanout, would there be anything wrong with a cleanout fitting on its side (in the horizontal piping immediately after the vertical -> horizontal transition)? Practically speaking, this would be a cleanout tee or wye on its side.