Building up flange

Users who are viewing this thread

Dmt78

Member
Messages
70
Reaction score
3
Points
8
Location
Louisiana
Hey guys, looking for advice on properly setting toilet flange on concrete slab. My original plan was to put the stainless steel flange on the slab and have the tile flush with the top. After adding the ditra material and tile, I’m wondering if I should build up the flange level some.
I saw a video with someone using a self leveling compound sealant to lift the height and it looked pretty solid.

Should I do a concrete patch material, self leveling compound, or mount as is?
Thanks
FBC20B51-D072-4469-B3ED-8EB82BACF6F7.jpeg
 
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks