Rick Jellison
New Member
I'm building a 30x40 home shop in my backyard and want to install a sink and a toilet. However, I am about 7 degrees grade below my septic system and about 150 feet away from the current house line. I've been looking at many options to remedy this but I'm not sure which would be the best for this purpose. I'd like to figure out if I need to bury whatever I choose to use in the the concrete floor before I start this process.
I will also need to move the discharge lines as they are right over the location I plan to build the shop. Looks like I'll need to hire a plumber to do this but right now I'm just looking for the best solution at a practical price.
Thanks,
Rick
I will also need to move the discharge lines as they are right over the location I plan to build the shop. Looks like I'll need to hire a plumber to do this but right now I'm just looking for the best solution at a practical price.
Thanks,
Rick