I understand ground and neutral must be bonded at the first point of dissconnnect. My meter socket has ground and netrual bonded together with a ground rod just below the meter socket. So does that make my main panel technically a sub panel, and grounds must be separated unsure if my actual meter socket would be my first point of disconnect then? The panel currently is currently bonded with two ground rods 8 feet apart.