I'm wondering about a belly that was found in a sewer line.
Sounds like the belly is about 99' from the clean-out, spanning something like 30'. and under about 15' of sidewalk and pavement,
Does anyone have a ballpark idea on what this should cost, and how long the work might be?
There haven't been any actual issues with clogs or backups that I've heard, so I'm also wondering if this looks like it even needs to be addressed right now.
I've linked the video below for the curious
Pooling begins at about the 2:54 mark