IdahoPotato
New Member
I am getting ready to rough in the drains in our bathroom remodel project. I am looking for a good way to tie all of the drain lines together before connecting to the existing cast iron fitting sticking out of the basement wall. I have about 20" of space between the top of the cast iron and the bottom of the floor joists. Looking for any ideas or feedback.
Thanks.
Thanks.