Basement plumbing

Discussion in 'IPC Plumbing Code Questions' started by Brunstown, Apr 4, 2019.

  1. Brunstown

    Brunstown New Member

    Joined:
    Apr 4, 2019
    Location:
    Alabama
    5E58AB3B-6B8D-48A2-8E64-54ED46E19B1B.jpeg Everything in red is what exists. My plan is to wet vent the bathroom groups through the new 3” Vent stack. The issue I’m running into is toilet placement because toilets are supposed to be at end of run. If I tie the toilet in the new location into the 1.5” existing vent and run the drain straight through , will the wet vent then work properly serving both bath groups? IPC here.
     
Similar Threads: Basement plumbing
Forum Title Date
IPC Plumbing Code Questions Basement Bathroom - Single Vent Jul 13, 2020
IPC Plumbing Code Questions Basement bathroom - struggling for layout ideas Apr 9, 2020
IPC Plumbing Code Questions No Future Vent In Basement--Where do I vent Toilet, Sink and Shower Mar 3, 2020
IPC Plumbing Code Questions Where to tie in new basement vent Feb 16, 2020
IPC Plumbing Code Questions Moving basement Washing Machine Jan 3, 2020

Share This Page