Everything in red is what exists. My plan is to wet vent the bathroom groups through the new 3” Vent stack. The issue I’m running into is toilet placement because toilets are supposed to be at end of run. If I tie the toilet in the new location into the 1.5” existing vent and run the drain straight through , will the wet vent then work properly serving both bath groups? IPC here.