Hotbacon
New Member
I have a 2" pipe coming out of our basement floor going up to the roof, which I assume is intended to be a wet vent for the basement lav/shower/water closet. I plan to cap the shower drain (we don't need another shower), and tie into the 2" pipe to install the lav. Can I just tie into the line with a wye and call it a day, or do I need another vent somewhere? See crude drawing located at:http://basementrefinishing.shutterfly.com/pictures/20. The red is the proposed new lav plumbing.