Hi all -
My plumber abandoned the job and hasn't returned calls or texts for a week so I'm in quite a pickle. I really need to get inspected and get these walls and floor closed up so any help would be huge.
I've attached pics of the floor plan and what I found at the house today. There's a ton of pipe and fittings left here - best I can tell he was planning to wye a 2" from the double lav into the shower , then wye them both into the 3" waste (the wye currently on the 3" waste has "shower/sink" written on it. There's another 3x3x2 wye with "vent" written on it and I believe the plan was to put that wye on after the shower and sink wye and 45 a vent to the knee wall, then horizontal to the 2x6 wall behind the shower and up though the roof. Then continue on with the 3" waste with an L to the waste stack.
Would this be kosher? Is there a better/faster/easier way to do this? Can I use what he did or should I just rip out and start over?
Thanks in advance for any help!
My plumber abandoned the job and hasn't returned calls or texts for a week so I'm in quite a pickle. I really need to get inspected and get these walls and floor closed up so any help would be huge.
I've attached pics of the floor plan and what I found at the house today. There's a ton of pipe and fittings left here - best I can tell he was planning to wye a 2" from the double lav into the shower , then wye them both into the 3" waste (the wye currently on the 3" waste has "shower/sink" written on it. There's another 3x3x2 wye with "vent" written on it and I believe the plan was to put that wye on after the shower and sink wye and 45 a vent to the knee wall, then horizontal to the 2x6 wall behind the shower and up though the roof. Then continue on with the 3" waste with an L to the waste stack.
Would this be kosher? Is there a better/faster/easier way to do this? Can I use what he did or should I just rip out and start over?
Thanks in advance for any help!