DaveTaylor
New Member
Hello all,
I am adding a new bathroom on the main floor and the current drainage exits the basement through a high line. I've been told "there isn't enough room in this stack" and it needs to be totally redone. My first question is, based on the picture could I run the tub drain into a side inlet tee with the toilet sani-tee? Or perhaps combine the tub and ejector with a wye (above or below the toilet)? This would free up the room I need, basically I need to bring in another 4" drain pipe. I will be adding a toilet, lav, shower and washer which will all be vented with AAM's. Thanks
I am adding a new bathroom on the main floor and the current drainage exits the basement through a high line. I've been told "there isn't enough room in this stack" and it needs to be totally redone. My first question is, based on the picture could I run the tub drain into a side inlet tee with the toilet sani-tee? Or perhaps combine the tub and ejector with a wye (above or below the toilet)? This would free up the room I need, basically I need to bring in another 4" drain pipe. I will be adding a toilet, lav, shower and washer which will all be vented with AAM's. Thanks
Last edited: