I am remodeling my bathroom. I went to a big box retail store to buy a toilet flange to fit my 3" sewer line. The only one I could find is a size that would allow the pipe to be glued to the inside of the flange. Is this ok to do and meet the UPC code? Wouldn't the solids possibly get stuck on the edge of the pipe in side the flange?
Thank you, Greg
Thank you, Greg