jwarr
New Member
Hey all, I've seen a few discussions on fitting a 2" trap for a shower in the vertical space for a 2x8 floor joists. I've seen a few solutions and wanted to see if anyone sees an issue with this. Take a look at the pics but essentially it is 3 90s and 2 45s so that there is enough clearance to lay subfloor without the drain pipe being peeking above the floor joist. Conceptually I think it works since the highest point of the "trap" is lower then where it starts to slope down to drain, therefore keeping water in the trap. Only thing it is draining is a shower. Thanks in advance!