bocavender
New Member
Hey there, hopefully I get all the terminology right. I am building out a little suite that has a bathroom and a kitchenette. I have a vanity that tees into vent that goes up and out (2”). That drains into a 3” line. A toilet is slightly higher than where the vanity ties in and is wet vented through the vanity line. Below that, the shower/tub ties in with its own vent and then the kitchen sink with its own vent after that. Then it turns down and goes out to septic line.
Do I need a vent at the end of the circuit before it goes down and out? Kinda like a vent stack I guess. Or is it vented enough through each fixture?
Do I need a vent at the end of the circuit before it goes down and out? Kinda like a vent stack I guess. Or is it vented enough through each fixture?