1 Story Circuit Venting

Users who are viewing this thread

bocavender

New Member
Messages
1
Reaction score
0
Points
1
Location
Griffin, Ga
Hey there, hopefully I get all the terminology right. I am building out a little suite that has a bathroom and a kitchenette. I have a vanity that tees into vent that goes up and out (2”). That drains into a 3” line. A toilet is slightly higher than where the vanity ties in and is wet vented through the vanity line. Below that, the shower/tub ties in with its own vent and then the kitchen sink with its own vent after that. Then it turns down and goes out to septic line.

Do I need a vent at the end of the circuit before it goes down and out? Kinda like a vent stack I guess. Or is it vented enough through each fixture?
 
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks