Search results

  1. I

    Supply 3 shower heads with 1/2" pex

    I am in the middle of a bath remodel. The original copper lines in the wall for the shower had the 1/2" supply for hot capped, probably due to a leak or low pressure. It was done when the house was built. They put a T on the garden tub stub up which is in the middle of the floor and ran that...
  2. I

    1/2" copper to 1/2" pex

    I am in the middle of a bath remodel. The original copper lines in the wall for the shower had the 1/2" supply for hot capped, probably due to a leak or low pressure. It was done when the house was built. They put a T on the garden tub stub up which is in the middle of the floor and ran that...
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks