Search results

  1. ueRaTaRV

    8in rough in

    Unfortunately, I wish it was a typo. But the original plumber that laid out the underground stubbed in the waste pipe 14in off the concrete wall. Then cement basement floor poured, stud walls built, drywall hung, flooring installed and now the waste pipe is 8in centered away from finished drywall.
  2. ueRaTaRV

    8in rough in

    Hello, I have an unusual predicament. Original plumber that installed our basement plumbing when we built our house, stubbed in the toilet waste pipe 14in of concrete wall. Now that basement is being completed, new plumber does not have any ideas besides busting up the concrete floor. The...
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks