ghaun
Member
Hello,
I am a bit confused by the slopes provided in table 906.1.
It makes sense that a 2" pipe at 1/4" per foot would max out at 8 feet in length. That would put the level right at the top of the pipe meeting the vent.
...but what I don't understand is the 1/8" per foot requirement for the 3" pipe. That would put it at only half full at 12 feet.
Am I misinterpreting that chart?
Thank you!
I am a bit confused by the slopes provided in table 906.1.
It makes sense that a 2" pipe at 1/4" per foot would max out at 8 feet in length. That would put the level right at the top of the pipe meeting the vent.
...but what I don't understand is the 1/8" per foot requirement for the 3" pipe. That would put it at only half full at 12 feet.
Am I misinterpreting that chart?
Thank you!