I primed and cemented PVC pipe and fitting (1.5 inch bathtub drain) according to manufacturer's instructions and then quickly pushed the pipe in as hard as I could with a quarter turn.
However, as shown in the first picture, the PVC pipe went in about 1/2 inch and did not "bottom out" the full 3/4-ish depth of the fitting. The picture I took shows the inside of the fitting where there is a small ridge and a 1/4 inch purple ring.
My worry is that the ridge will trap hair or debris that goes down the drain or that the drain is a weak connection.
Do I need to buy a new drain piece and start over? If so, how do I get the PVC to "bottom out" inside the fitting?
However, as shown in the first picture, the PVC pipe went in about 1/2 inch and did not "bottom out" the full 3/4-ish depth of the fitting. The picture I took shows the inside of the fitting where there is a small ridge and a 1/4 inch purple ring.
My worry is that the ridge will trap hair or debris that goes down the drain or that the drain is a weak connection.
Do I need to buy a new drain piece and start over? If so, how do I get the PVC to "bottom out" inside the fitting?