Recent content by Endmout

  1. Endmout

    Adding second floor bathroom

    Existing sewer is 4"CI coming up out of the floor. Could save a few $ but I'm going with 4" all the way through. Pretty sure it will fit this way as I have a lot of it in already.
  2. Endmout

    Adding second floor bathroom

    Anyone see a problem with my riser diagram? Full bath on main floor and second floor stack tie into main trunk line with 4" wye's. Redoing all the plumbing as it was originally CI with threaded galvanized. No flat vents in this design. All DWV is sch 40 PVC. Thanks
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks