DanFL
Member
I need to move the existing toilet rough-in to the new location shown in the picture. Is it allowed to leave the old wye in place and just cap it, or do I need to cut it out and use a coupling to the main line? If I can cap it, does it matter whether I cap on the horizontal wye inlet or vertical drop from the toilet?